Mainline power
About 11 pump stations
Each station 8–12 pumps of 5,000–7,000 hp. Installed capacity 440–460 MW. Total project power need about 500 MW, including valves, terminals, and other kit. A grid study is part of early design.
Fort McMurray · 1 October 2026
Prime Minister Carney and Premier Smith listed the West Coast Oil Pipeline — now Pacific Link — under Schedule 1 of the Building Canada Act. For Alberta and B.C. shops that plan and build things, the paid work starts before pipe: environmental programs, contracting strategy, land, and engineering field work.
Bruderheim, AB → Roberts Bank, Delta, BC · 1 million b/d · Trans Mountain to build and operate · Warre & Vavasour is not a project partner
We are a Canmore vendor to the vendors. This page is project intelligence for suppliers. We are not affiliated with Pacific Link, Trans Mountain Corporation, the Government of Canada, the Government of Alberta, or Pembina Pipeline Corporation.
01Why it matters now
Listing is not construction. Alberta is clear: no pipe is in the ground. The July submission’s current stage is owner-team ramp-up, a narrower centreline, engineering design, a power study, materials strategy, contracting strategy, land acquisition, constructability review, and early contractor planning. Environmental service providers are already marked selected.
The Prime Minister’s release says that over the next year the proponents will work up a final concept — community consultation, route mapping, ecological surveys, cost estimates, procurement, and workforce planning — while the Major Projects Office, supported by the Canada Energy Regulator, writes a single conditions document by 1 September 2027.
No EPC or construction contractor has been named. We found no public procurement notices as of 1 October 2026. The shops that get ready now are the ones who can answer when Trans Mountain opens the door.
02Key facts
Numbers below trace to the official listing and Alberta’s Major Projects Office submission.
03The route
The line is meant to join the existing Trans Mountain (TMEP Line 2) right-of-way near Wabamun, Alberta, and leave it near Hope, B.C. From there it crosses the Fraser Valley, Langley, and Surrey to Roberts Bank. The final route is not set. The proponents and the submission say it will be refined through geotechnical engineering and engagement.
In Alberta the submission names Strathcona County, Sturgeon County, Lac Ste. Anne County, Parkland County (Spruce Grove, Stony Plain, Wabamun), Yellowhead County (Edson, Hinton), the Town of Jasper, and Jasper National Park — about 7% of the route. In B.C.: Mount Robson Park; Thompson-Nicola (Blue River, Clearwater, Little Fort, Kamloops); Fraser Valley (Hope); then Metro Vancouver — Township of Langley, Surrey, and Delta.
Planned deviations from Trans Mountain include south of Moose Lake / north of Kinbasket Lake, the Raft River valley between Blue River and Clearwater, and north of Kamloops to avoid the airport and sensitive lands.
West of Hope there are two corridor options. The optimized (north) crossing goes over the Fraser near Hope, runs north of Highway 7 past Harrison Hot Springs, Harrison Mills, Lake Errock, Deroche, Dewdney, and Hatzic, then recrosses into Langley. The original (south) option runs past Bridal Falls, Slesse, and Cultus Lake, near the U.S. border, through Abbotsford to south Langley. Both then run through Langley and Surrey and along Highway 99 to Roberts Bank.
Access and logistics communities named in the submission: Fort Saskatchewan, Edson, Hinton, Jasper, Clearwater, Blue River, Kamloops, Merritt, Hope, Chilliwack, Mission, Langley, and Delta. Heavy haul is on Highways 1 and 5. Fly-in hubs are Edmonton, Kamloops, Abbotsford, and Vancouver.
04Scale of the build
Mainline power
Each station 8–12 pumps of 5,000–7,000 hp. Installed capacity 440–460 MW. Total project power need about 500 MW, including valves, terminals, and other kit. A grid study is part of early design.
Alberta end
About 50–65 hectares. Fifteen tanks. 6.5 million barrels of working storage. A hub to receive, measure, store, and pump crude into the line.
B.C. end
About 260 hectares, with a ~130-hectare tank farm (15 tanks, 6.5 million barrels). Two VLCC berths. A causeway and jetty of about 5,000 m. Part of the terminal sits in Tsawwassen First Nation Treaty Lands. Port of Vancouver jurisdiction.
Camps
Temporary camps, possibly on former Trans Mountain Expansion sites, where commercial lodging is thin: Yellowhead, Jasper, Valemount–Blue River, North Thompson, Coquihalla.
Materials
Pipe, tanks, and pumps staged along the corridor. Roughly 1,200 km of 42-inch pipe. Rail, truck, and marine delivery.
Yards
Plus temporary roads, bridges, matting, and workspace. Early works, if authorized, start with access, clearing, temporary infrastructure, major trenchless crossings, and marine piling.
05Who supplies a build like this
Categories drawn from what the submission says it needs. No private firm is named here as if it had a Pacific Link contract — none have been announced.
Now through 2028
2027 through construction
Labour and training anchors named by the submission: Edmonton institutions, Northwestern Polytechnic, Thompson Rivers University, BCIT, and the University of the Fraser Valley.
06How Warre & Vavasour helps
We sell AI training and AI deployment to the businesses that plan and build infrastructure. Member of the Claude Partner Network. Our training is built on Claude.
Training
A 3-hour, phones-away class for owners and office managers. Live CanadaBuys and Alberta Purchasing Connection triage. Shop Seat $1,950 CAD, up to 3 people.
Bid desk
Find and triage live federal and Alberta public work. Searching is free. Pro ($85 CAD/month) opens the tender package. Use it when Pacific Link procurement lands on a public portal — and for the public work you can already bid.
Claude
Add the hosted workspaceAlberta MCP in Claude and ask for live public work in plain language. Searching is free.
07Sources
Facts on this page come from the documents below. Where sources disagree or a number exists only in news reporting, we say so or leave it off.
08Get the desk ready
Use the year to get the shop ready — tenders you can already bid, and a desk that works when this one lands.
Warre & Vavasour Ltd · Canmore, AB · Independent AI laboratory · Not a Pacific Link proponent